Whether you’re moving into a new BTO flat or upgrading your resale HDB unit, a renovation transforms your flat into a comfortable, modern, and personalized space. However, renovating an HDB flat in Singapore is more than just a home improvement project; it’s a regulated process with strict rules every homeowner must follow. Unlike private properties, HDB flats fall under strict HDB renovation guidelines to ensure the safety of the building structure and the comfort of your neighbors.
Before you start hacking walls or laying new tiles, you’ll need to understand the essentials, such as when you can renovate, which works require an HDB renovation permit, and why you should only engage an HDB-approved renovation contractor. Failing to comply with these rules could lead to delays, penalties, or even having to undo completed works.
This guide covers everything you need to know about HDB renovation permits, renovation timing, contractors, and official guidelines, so you can plan your dream home makeover smoothly and confidently.
Why HDB Renovation Guidelines Matter

When planning a home makeover, many homeowners focus on design, furniture, and finishes—but often overlook the rules behind it. For HDB renovations in Singapore, these rules aren’t just for formalities; they are crucial for protecting safety, harmony, and long-term value of your home.
The HDB renovation guidelines exist to:
· Maintain structural safety – Preventing unsafe wall hacking or flooring works that could weaken the building.
· Protect neighbors – Reducing noise, dust, and disruptions that affect those living nearby.
· Ensure compliance with safety standards – Covering areas such as electrical wiring, plumbing, windows, and fire-rated doors.
· Safeguard your investment – Unauthorized works may not only lead to fines but also reduce your flat’s resale value.
By following these HDB renovation rules, you avoid unnecessary delays, penalties, and complaints while ensuring that your dream home transformation is safe and stress-free.
HDB Renovation Permit: What You Need to Know

An HDB renovation permit is one of the first steps before starting major works in your flat. This approval ensures that your planned works are safe and compliant.
Works That Require an HDB Renovation Permit
1. Hacking walls – Removing walls, especially load-bearing ones, requires HDB approval. Unauthorized hacking can endanger the entire block.
2. Re-tiling floors and walls - Since tiling affects structural slabs, approval is necessary.
3. Window replacement – Only BCA-approved contractors can do this. Poorly installed windows may fall and cause accidents.
4. Toilet renovation – For BTO flats, hacking toilet floors or walls is not allowed in the first 3 years to prevent leakage.
5. Changing main doors and gates – Fire-rated doors must be maintained for safety.
Works That Do Not Require an HDB Renovation Permit
· Painting walls or ceilings
· Installing built-in wardrobes or kitchen cabinets
· Laying vinyl, laminate, or carpet flooring over existing flooring
· Minor electrical works (by a licensed electrician)
HDB Renovation Guidelines for Tiling

Tiling is one of the most common renovation works in an HDB flat, whether it’s upgrading old bathroom tiles, redoing the kitchen backsplash, or giving your living room floor a sleek new look. But before you start, read this first.
When You Need an HDB Tiling Permit
Not all tiling works can be done freely. You’ll need an HDB renovation permit for tiling if the work involves:
· Hacking existing tiles – Removing floor or wall tiles may affect the structural slab.
· Re-tiling wet areas – Bathrooms and kitchens require permits due to waterproofing rules.
· Replacing floor finishes – Works like marble, granite, or ceramic tiling needs approval.
Restrictions for New BTO Flats
If you own a new BTO flat, there are additional restrictions. For the first 3 years, you cannot hack or replace the tiles in bathrooms because the waterproofing warranty is still in effect. Doing so may cause water leakage to neighboring units.
Why Professional Tiling Matters

Tiling is more than just aesthetics. It affects your home’s durability and maintenance. Engaging an HDB-registered renovation tiling contractor ensures that:
· Proper waterproofing is applied to prevent leaks
· Tiles are evenly laid for safety and visual appeal
· The right adhesives and grout are used for long-term durability
· Works comply with HDB flooring and tiling rules
Common Mistakes in Tiling Works
· Skipping waterproofing in bathrooms and kitchens
· Using unapproved contractors who cut corners
· Ignoring the warranty period for new flats
· Choosing tiles that are too heavy or unsuitable for HDB flats
How to Apply for an HDB Renovation Permit

The good news is that you don’t have to apply for a permit yourself. Your chosen HDB-registered contractor will do it for you.
Step-by-step process:
1. Engage an HDB-approved renovation contractor from the Directory of Renovation Contractors (DRC).
2. Contractor submits your renovation plan online through the HDB portal.
3. HDB reviews the application, which usually takes about 3 weeks.
4. Permit approval is granted, valid for up to 3 months. Extensions can be requested if needed.
Never start renovation works before approval, as doing so can lead to fines and additional delays.
HDB Renovation Timing Rules

Renovation works are noisy and disruptive, so HDB enforces strict timing regulations to minimize disturbance to neighbors.
General Renovation Hours
· Mondays to Saturdays: 9:00 AM – 6:00 PM
· Sundays and Public Holidays: No work allowed
Noisy Works (Hacking, Drilling, Heavy Work)
· Allowed Mondays to Fridays: 9:00 AM – 5:00 PM only
· Not permitted on Saturdays, Sundays, or Public Holidays
Examples of noisy works include wall hacking, tile removal, and heavy drilling.
Following these rules keeps you on good terms with neighbors and avoids complaints to HDB or the Town Council.
Choosing the Right HDB Renovation Contractor
Not every contractor is allowed to work on HDB flats. You must engage a contractor listed under the HDB Directory of Renovation Contractors (DRC).
Benefits of Hiring an HDB-Registered Contractor
· Familiar with HDB renovation guidelines
· Handles the permit application for you
· Reduces the risk of violation or fines
· Ensures structural and safety compliance
How to Choose the Right Contractor
1. Check the HDB’s official DRC list – only contractors here are approved.
2. Check their previous works – look for reliability and workmanship.
3. Ask for multiple quotations – balance cost with quality.
4. Confirm warranty or after-service support – good contractors like Chop Heng Long Interior and Renovation stand by their work.
How to Ensure a Smooth HDB Renovation
· Plan early – apply for permits and plan for delays.
· Inform neighbors – reduce disputes by giving them notice.
· Work with experienced contractors – they know HDB processes.
· Regularly inspect progress – ensure rules are followed.
HDB Renovation Costs in Singapore
Renovation costs depend on the flat size, age, and design style. On average:
· Basic renovation: S$8, 000 – S$35,000 (painting, flooring, carpentry)
· Resale flat renovation: S$50,000 – S$90,000 (hacking, rewiring, plumbing)
· Luxury renovation: S$90,000+ (custom carpentry, designer finishes)
However, there are contractors like Chop Heng Long Interior and Renovation that offer HDB renovation packages for as low as S$13,888.
Always ask your HDB renovation contractor for a detailed quotation to avoid hidden costs.
FAQs About HDB Renovation
1. How long is an HDB renovation valid?
An HDB renovation permit is typically valid for 3 months from the date of approval. If your renovation extends beyond this period due to delays or scope changes, you can apply for an extension. Make sure your HDB-approved contractor handles this process to avoid penalties.
2. What happens if I hire a non-HDB registered contractor?
Using an unregistered contractor puts you at risk of:
· Stop-work orders for HDB
· Safety hazards from unlicensed work
· Loss of warranty for new BTO flats
· Potential fines and forced rectification
3. Can I renovate my kitchen and bathroom at the same time?
Yes, but only if your contractor ensures compliance with HDB renovation rules, waterproofing, and permits for hacking works. Coordinating both areas at once can save time, but requires careful planning.
Conclusion
Renovating an HDB flat in Singapore is an exciting opportunity to personalize your home, but it comes with responsibility. By ensuring and following the HDB renovation guidelines, you protect not only your investment but also the safety and comfort of your household and neighbors.
Key takeaways:
· HDB renovation permits are mandatory for major works such as backing walls, re-tiling floors, and replacing windows.
· HDB renovation timing rules must be respected to minimize noise disturbances and avoid complaints.
· Engage only HDB-registered renovation contractors to guarantee compliance with all HDB regulations and ensure quality workmanship.
· Follow HDB tiling, electrical, plumbing, and structural guidelines to avoid fines, safety risks, and costly rectifications.
With careful planning, the right contractor, and adherence to HDB renovation rules, your renovation journey can be smooth, stress-free, and rewarding. Your dream HDB flat —functional, safe, and stylish —is entirely achievable with the right approach.
Ready to Transform Your Floors and Walls?
If you’re looking for professional HDB tiling services in Singapore, Tiling by Meng specializes in high-quality, durable, and HDB-compliant tiling for bathrooms, kitchens, living rooms, and more.
· Licensed and HDB-approved contractor
· Expert advice on materials, layout, and waterproofing
· Safe, fast, and hassle-free installation
Contact us today at 9632 3845 for a free quotation and consultation or visit our website at www.tilingbymeng.com today.
Comments